News:
- Coal India Limited's Executive Hiring Set To Jump This Fiscal -
- China planning 226GW of new coal-fired power projects -
- AGL resists push for early coal power plant closures -
- NYK clinches 25-year coal shipping contract -
- Good news, bad news: 4 trends in US energy use -
- China plans 226 GW of new coal power projects -environmental groups -
- China plans 226 GW of new coal power projects - environmental groups -
, Anthracite
06.07.2018
AnthraciteDetails
Size:
13-25 mm
Total Moisture (ARB):
6-7 %
Total Sulfur (ADB):
0.3-1 %
Price:
---- UAH
AnthraciteDetails Size: 0-6 mm Total Moisture (ARB): 6-8 % Total Sulfur (ADB): 0.3-1 % Price: ---- UAH
AnthraciteDetails Size: 0-6 mm Total Moisture (ARB): 6-8 % Total Sulfur (ADB): 0.3-1 % Price: ---- UAH
Shipping address:
Ukraine ,not specified
Ukraine ,not specified